CASE STUDY : Clothing Retailer Post Merger Deployment
Clothing Retailer Post Merger Deployment
Designed Deployment Architecture and Process for initial Pilot and roll out for a Global retail chains post-merger stores. Preformed project prior to crucial Black Friday Sales Event in a 7-week timeline for Pilot in week 1 and 5 weeks for roll-out phase 2.
Project Scope included:
- Project Management of Pilot and roll-out
- Site based labor to perform::
- Local Network Switch Upgrade and Cut-over
- Reimage 3 POS / PC per location
- iPod cutover
- Validation all services are working
- Go Live Support
- Uilize Deployment Manager Tool to
- Provide real time reporting to the retail chain and System Integrator
- Manage project schedule and labor
- Input the tasks and monitor
Performance Metrics
Planning including identification of roles and responsi bilities of various stakeholders
- Planning and Selection of outlets for the Rollout
- Define the Team Structure
- Identify Pilot Stores
- Create Project Planning & Scheduling
Installation SLA
- Equipment scheduling
- Site walk through & ease of access to equipment
- Site readiness for migration.
- Asset inventory of equipment shipments received onsite, connectivity and power availability
- Cabling and networking switch-over as per diagram
Deployment
- Image Deployment
- Install client provided images for specific devices (POS, PCs etc.)
- Network Cutover
- Moving existing network devices
- Cabling including trace / label
- Establish connectivity
- Configure POS, PC
- Remove & replaced devices to designated location
- POS Cutover
- Applications accessibility from POS
- Establish connectivity to peripherals
- Test end to end transaction
- IPOD Cutover
- Establish Network and Wireless Access Point
- Verify downloaded encrypted credit card program
- Test end to end transaction
- Vendor Equipment Cutover
- System check
- Lighting, thermostat and other peripherals inspect
Post Install Verification
- Walk through with designated site in charge on PC, POS, IPOD and other equipment deployed
- Hardware inventory, task checklist and confirmation to migration
- Shipment of replaced devices and update asset inventory
Go Live & Sign Off
- Go live support for designated duration
- Log, track end user issues via service desk
- Rerun & validate PC, POS, IPOD on go live
- Site walk through, update migration team and site coordinator
- Sign off on successful migration
- Confirm operational handover to stakeholders
Our Clients